Banha Project

The PSEW had worked on 2011 on erection of 5 storage tanks project for the Giza north 750 MW combined cycle power project or the benefit of middle delta electricity power Product Company and each of the solar tanks is of the following description.

 

Solar Tank (2)

Demieralized tanks (2)

Water Tank (1)

Type

Supported

Self-supported

supported

Material

Carbon steel

Stainless steel

Carbon steel

Capacity

(m³)

10600

1025

1670

Diameter

(m)

35

12

14

Height

(m)

12.5

10

12