North Giza Project

The PSEW had worked on 2012 on erection of 5 storage tanks project for the Giza north 1500 MW combined cycle power project or the benefit of Cairo electric power Product Company of cost 34065900 LE (Egyptian Pound) and each of the solar tanks is o the following description.

 

 

Solar Tank (2)

Demieralized tanks (2)

Water Tank (1)

Type

Supported

Self-supported

supported

Material

Carbon steel

Stainless steel

Carbon steel

Capacity

(m³)

25820

1500

2000

Diameter

(m)

41

12

15

Height

(m)

22.5

15

13

Project Gallery