SC CENTRAL GARAGE

The PSEW company has constructing the Ismailia central garage in behalf of the Suez Canal Authority with length of 120 meters, width of 35.5 meters and 12 meters in high

Elnasr steel bridge

on 1998 the PSEW has built a steel bridge of 40m lenght and 650 ton load acceptance for the benefit of Elnasr company